Sorry for the length of this post, but with the recent drop in the stock price I wanted to do a deep dive into each asset and determine if the market is unfairly punishing the company for it's exposure to the energy sensitive Houston market. Some of my Excel screenshots don't lend themselves to the limitations of Blogger, so just click on them for a better view.
Honolulu - Ward Village
Howard Hughes owns Ward Village, which is a few blocks of miscellaneous retail real estate situated along the ocean just west of Waikiki Beach and Ala Moana Shopping Center (which GGP owns) in downtown Honolulu. There's currently 678,000 square feet of shopping, restaurants, etc. generating $24.1MM of net operating income, most of these are small unique shops that appeal to the local population and not the brand name stores you'd expect to see at nearby Ala Moana Shopping Center. It's a bit old and tired looking in its current form. However, Ward Village is in the beginning stages of being redeveloped into a new master planned community where Howard Hughes will construct 15+ towers with a total of 4,000 condominium units and other mixed use retail/entertainment/office properties. The development will take about another decade to fully complete.
Pacific Ocean is just below the map |
There are currently two towers being constructed (Waiea and Anaha) and 4 others that are in the pre-sale process.
- Waiea & Anaha Towers: There will be 485 units in the combined two initial towers, both condo units and townhouses on the lower/terrace levels with additional retail on the street level. About 90% of the units are under contract, buyers put a deposit down on the units which Howard Hughes is using as initial funds for construction and then tapping a $600MM construction loan for the two towers. The estimated cost for the development is $804MM or a cost per square foot of ~$980, they're selling the units for about ~$1,450 a square foot for a total expected sales of $1.2B in revenue. Waiea is expected to be done by the end of 2016 and Anaha in the first quarter of 2017.
- Additionally they have four towers that are in various pre-sale stages:
- Ae'o Tower: This used to be "Ward Block M" in their previous filings, it will feature small units (average of 836 square feet) and try to appeal to the local population. Additionally the ground floor will feature a Whole Foods, the type of high quality tenant they're trying to attract to Ward Village going forward. As of October 20, 2015, 167 of the 466 units were under contract, they're expected to break ground in March and finish construction in 2018.
- Gateway Towers (2): These will be the priciest of the early development and no timeline has been given on when they'll be constructed. There will be 236 units and an additional 20,000 square feet of retail.
- Ke Kilohana Tower: As part of the development plan, Howard Hughes needs to set aside a certain number of workforce units reserved for qualified Hawai'i residents. This tower will have a total of 424 units, 375 of which are workforce housing starting in the $300,000's.
Maybe it's too simplistic, but I think it's hard to argue that the condo pipeline doesn't have a net present value of at least $1 billion. Additionally, Ward Village still is an active operating property generating over $24MM in NOI, at a 6% cap rate, that's worth roughly $413MM (minus the debt on it), but I have all the operating properties listed out further down the post.
Las Vegas - Summerlin
Summerlin, named after Howard Hughes' grandmother, is a large master planned community located on the western edge of Las Vegas. Howard Hughes Corporation currently owns 5,300+ acres that are entitled for further residential and commercial development in Summerlin. The housing bubble hit Las Vegas especially hard with construction coming to a standstill in the years immediately following, however the situation has improved greatly there with Summerlin land prices essentially doubling in 2015 compared to 2012.
In 2014, Downtown Summerlin was constructed, the company says its the only large retail development to open in the United States since the economic downturn. General Growth Properties poured a significant amount of money into the project prior to 2008-2009, it was mothballed during the recession, and then restarted by Howard Hughes in an effort to create a central commercial/retail hub for the master planned community.
The current retail/office build out is within the green arrows, the design to the east of it is 200 acres of future development opportunities including the relocation of the NY Mets triple-A baseball affiliate the Las Vegas 51s which is half owned by HHC. The approved plan entitles HHC to build 2.8 million square feet of commercial space and 4,000 residential units on the site. The first Downtown Summerlin residential project is under construction, dubbed The Constellation, which HHC entered into a JV with a developer where the company only contributed land but is a 50-50 partner in the venture, it's a popular model for them and retains some of the upside.
Outside of downtown, they also entered into another joint venture, this time with Discovery Land Company, to build 270 luxury homes ($2-10MM price range) where Howard Hughes contributed about 553 acres at $226,000 per acre, or $125MM into the joint venture. The land had a book value of $13.4 million, a consistent theme in a lot of these deals highlighting the disconnect between book value and the market value of their holdings
Farther down below I group Summerlin with the other master planned communities and simply attempt to NPV the land sales moving forward. But that understates the potential value of the MPC as Howard Hughes will do a lot of the development themselves or in joint ventures, but there are too many assumptions involved to accurately project out that growth.
Houston - The Woodlands, The Woodlands Hills, Bridgeland
So here we get to what I believe is the market's concern, Houston, from the 10-K:
By my count they've built 7 new office buildings with over 1.5 million square feet, over 1,000 apartment units, 900+ hotel rooms, and over 200,000 square feet of retail space since being spun-off in 2010. It's likely safe to say the pace of construction is going to slow significantly in the coming years as energy companies (Exxon, Chevron, Anadarko, Huntsman, Baker Hughes, Keiwit Energy are all major tenants in The Woodlands) pull back their growth in North American in response to oil low prices.
In my model I've bumped up cap rates on all their Houston operating properties 0.5-1.0% and assuming 0 land sales are going to take place in the next two years at The Woodlands. Howard Hughes isn't a leveraged oil and gas exploration company that has no choice but to keep pumping despite low prices in order to service debt. The company has the luxury to be able to sit on their land holdings and wait for the supply/demand to stabilize, they control most of the remaining development locations in The Woodlands and don't need to rely on other market players to return to sanity (like energy).
One property to keep an eye on is Three Hughes Landing, it's a 324,000 square foot class A office building that Howard Hughes built on spec without a tenant. As of their latest filing, it was scheduled to be completed in the fourth quarter of 2015 and was still without a tenant.
Additionally the company owns two other master planned communities in Houston - Bridgeland which is to the northwest of the city and The Woodland Hills (f/k/a Conroe) which is north of The Woodlands. Both of these are rather new representing additional growth opportunities, but that growth is probably pushed out a few more years now that Houston has slowed to crawl.
Columbia, Maryland
Downtown Columbia, Maryland is one of Howard Hughes' more under the radar developments, but it should start accelerating to the forefront in 2016. The company currently has over 1 million square feet in office space in Downtown Columbia (between Baltimore and Washington) which they plan to redevelop over the next several years. Fort Meade, a U.S. Army base, is located 11 miles from Columbia and is a major employer as the headquarters of the United States Cyber Command, National Security Agency, and Defense Information Systems Agency. These are in demand, high paying, secure government jobs.
Their approved redevelopment plan includes up to 5,500 new multi-family units, 1.2 million square feet of retail, 4.3 million square feet of commercial office space, and 640 hotel rooms. Extrapolating their current NOI per square foot in Maryland (which need redevelopment), the full plan could add another $180MM in NOI annually.
Further Reading:
http://www.baltimoresun.com/news/maryland/howard/columbia/ph-crescent-property-planning-board-story.html
http://planhoward.org/downtown_columbia_plan.pdf
Net Present Value of MPC Land Sales
For the purposes of valuing the master planned communities I've assumed that all land will be sold to third parties at the weighted averaging selling price per acre since 2012 (hurts Summerlin for instance) and tried to simulate a couple economic cycles for the longer lived communities (Bridgeland and Summerlin). I also assumed no land sales at The Woodlands, used a discount rate of 15% for each MPC, and a 2% inflation/appreciation rate.
To save you a click, I valued the MPC land at $1.4B, which should be a conservative view as they will add company owned new build construction to their pipeline over time.
New York City - South Street Seaport
The company's most important, most valuable asset is the South Street Seaport in Manhattan, it was a neglected structure that was falling apart before Superstorm Sandy, and then was nearly completely destroyed by the storm in 2012. Pier 17 is currently under construction, scheduled to be completed in 2017, and will have 362,000 square feet of retail, entertainment, and restaurant space. The company has poured a lot of money into marketing the property, go here for a lot of sharp renditions of what it will look like when fully completed.
Additionally, Howard Hughes has been adding to their real estate assets around the Seaport. Their current proposal to the city includes approximately 700,000 more square feet of development including the Tin Building next door to Pier 17 which would feature a seafood market and possibly a mixed use high rise building, although that's faced some push back from local residents.
Some back of the envelope math on just Pier 17 shows it could generate $80MM annually in NOI, putting a 5% cap rate on that would make the property worth $1.6B. Then you could extrapolate that for the additional 700,000 square feet too if you want to be greedy.
Click on the below to expand, but I pieced out each of the operating assets and those that are far enough along in construction to estimate an NOI and cap rate.
To summarize, I'm estimating NOI of $283MM (probably 2017-2018 number) based on the current activity for a combine value of $4.7B, which net of associated debt and additional construction costs is worth $2.0B to HHC equity.
Miscellaneous Assets/Other Strategic Developments
Management
Bill Ackman, of Pershing Square, is the Chairman of the Board, he's obviously controversial and Howard Hughes might get lumped into some selling pressure when the market goes after Pershing Square's holdings but Ackman has made it clear that he has the most reputationally at stake with HHC compared to his other holdings (hard to believe based on his actions at VRX and HLF but he has pseudo control here).
Senior management do have warrants that they paid $19 million out of pocket for when joining the company in 2010. The strikes range from $42.23 to $54.50 and are exercisable starting in November 2016 and expire in February 2018. I'd be surprised to see management exercise early.
Adding It All Up
To recap, the above doesn't include:
I probably should have taken a closer look when the share price rose to $160 and noticed how much additional growth the market was pricing into the company. In one of Howard Marks' recent memos he wrote, "If you look longingly at the chart for a stock that has risen for twenty years, think about how many days there were when you would've had to talk yourself out of selling." That's kind of how I think of Howard Hughes, long term holding that's going to see a cycle or two but is quite attractively priced now.
Disclosure: I own shares of HHC
Las Vegas - Summerlin
Summerlin, named after Howard Hughes' grandmother, is a large master planned community located on the western edge of Las Vegas. Howard Hughes Corporation currently owns 5,300+ acres that are entitled for further residential and commercial development in Summerlin. The housing bubble hit Las Vegas especially hard with construction coming to a standstill in the years immediately following, however the situation has improved greatly there with Summerlin land prices essentially doubling in 2015 compared to 2012.
In 2014, Downtown Summerlin was constructed, the company says its the only large retail development to open in the United States since the economic downturn. General Growth Properties poured a significant amount of money into the project prior to 2008-2009, it was mothballed during the recession, and then restarted by Howard Hughes in an effort to create a central commercial/retail hub for the master planned community.
The current retail/office build out is within the green arrows, the design to the east of it is 200 acres of future development opportunities including the relocation of the NY Mets triple-A baseball affiliate the Las Vegas 51s which is half owned by HHC. The approved plan entitles HHC to build 2.8 million square feet of commercial space and 4,000 residential units on the site. The first Downtown Summerlin residential project is under construction, dubbed The Constellation, which HHC entered into a JV with a developer where the company only contributed land but is a 50-50 partner in the venture, it's a popular model for them and retains some of the upside.
Outside of downtown, they also entered into another joint venture, this time with Discovery Land Company, to build 270 luxury homes ($2-10MM price range) where Howard Hughes contributed about 553 acres at $226,000 per acre, or $125MM into the joint venture. The land had a book value of $13.4 million, a consistent theme in a lot of these deals highlighting the disconnect between book value and the market value of their holdings
Farther down below I group Summerlin with the other master planned communities and simply attempt to NPV the land sales moving forward. But that understates the potential value of the MPC as Howard Hughes will do a lot of the development themselves or in joint ventures, but there are too many assumptions involved to accurately project out that growth.
Houston - The Woodlands, The Woodlands Hills, Bridgeland
So here we get to what I believe is the market's concern, Houston, from the 10-K:
"Both MPCs benefit from their locations north and northwest of Houston in an area that is known as the Energy Corridor."
And then from the risk disclosures: "Continued lower oil prices compared to average oil prices over the past several years may have significant negative effect on the future economic growth of, and demand for our properties in certain regions where we have asset concentrations that are highly dependent on the energy sector."The Woodlands is the company's main master planned community north of Houston, it was started by fracking pioneer George Mitchell before being sold a few times and ending up in the hands of The Rouse Company, which was purchased by General Growth Properties (and spun out and now sold again). It is in the later stages of its development, most or the residential lots are sold out and Howard Hughes has been infilling dense commercial development into the Town Center and their newer development, Hughes Landing.
By my count they've built 7 new office buildings with over 1.5 million square feet, over 1,000 apartment units, 900+ hotel rooms, and over 200,000 square feet of retail space since being spun-off in 2010. It's likely safe to say the pace of construction is going to slow significantly in the coming years as energy companies (Exxon, Chevron, Anadarko, Huntsman, Baker Hughes, Keiwit Energy are all major tenants in The Woodlands) pull back their growth in North American in response to oil low prices.
In my model I've bumped up cap rates on all their Houston operating properties 0.5-1.0% and assuming 0 land sales are going to take place in the next two years at The Woodlands. Howard Hughes isn't a leveraged oil and gas exploration company that has no choice but to keep pumping despite low prices in order to service debt. The company has the luxury to be able to sit on their land holdings and wait for the supply/demand to stabilize, they control most of the remaining development locations in The Woodlands and don't need to rely on other market players to return to sanity (like energy).
One property to keep an eye on is Three Hughes Landing, it's a 324,000 square foot class A office building that Howard Hughes built on spec without a tenant. As of their latest filing, it was scheduled to be completed in the fourth quarter of 2015 and was still without a tenant.
Additionally the company owns two other master planned communities in Houston - Bridgeland which is to the northwest of the city and The Woodland Hills (f/k/a Conroe) which is north of The Woodlands. Both of these are rather new representing additional growth opportunities, but that growth is probably pushed out a few more years now that Houston has slowed to crawl.
Columbia, Maryland
Downtown Columbia, Maryland is one of Howard Hughes' more under the radar developments, but it should start accelerating to the forefront in 2016. The company currently has over 1 million square feet in office space in Downtown Columbia (between Baltimore and Washington) which they plan to redevelop over the next several years. Fort Meade, a U.S. Army base, is located 11 miles from Columbia and is a major employer as the headquarters of the United States Cyber Command, National Security Agency, and Defense Information Systems Agency. These are in demand, high paying, secure government jobs.
Their approved redevelopment plan includes up to 5,500 new multi-family units, 1.2 million square feet of retail, 4.3 million square feet of commercial office space, and 640 hotel rooms. Extrapolating their current NOI per square foot in Maryland (which need redevelopment), the full plan could add another $180MM in NOI annually.
Further Reading:
http://www.baltimoresun.com/news/maryland/howard/columbia/ph-crescent-property-planning-board-story.html
http://planhoward.org/downtown_columbia_plan.pdf
Net Present Value of MPC Land Sales
For the purposes of valuing the master planned communities I've assumed that all land will be sold to third parties at the weighted averaging selling price per acre since 2012 (hurts Summerlin for instance) and tried to simulate a couple economic cycles for the longer lived communities (Bridgeland and Summerlin). I also assumed no land sales at The Woodlands, used a discount rate of 15% for each MPC, and a 2% inflation/appreciation rate.
To save you a click, I valued the MPC land at $1.4B, which should be a conservative view as they will add company owned new build construction to their pipeline over time.
New York City - South Street Seaport
The company's most important, most valuable asset is the South Street Seaport in Manhattan, it was a neglected structure that was falling apart before Superstorm Sandy, and then was nearly completely destroyed by the storm in 2012. Pier 17 is currently under construction, scheduled to be completed in 2017, and will have 362,000 square feet of retail, entertainment, and restaurant space. The company has poured a lot of money into marketing the property, go here for a lot of sharp renditions of what it will look like when fully completed.
Additionally, Howard Hughes has been adding to their real estate assets around the Seaport. Their current proposal to the city includes approximately 700,000 more square feet of development including the Tin Building next door to Pier 17 which would feature a seafood market and possibly a mixed use high rise building, although that's faced some push back from local residents.
Some back of the envelope math on just Pier 17 shows it could generate $80MM annually in NOI, putting a 5% cap rate on that would make the property worth $1.6B. Then you could extrapolate that for the additional 700,000 square feet too if you want to be greedy.
Click on the below to expand, but I pieced out each of the operating assets and those that are far enough along in construction to estimate an NOI and cap rate.
To summarize, I'm estimating NOI of $283MM (probably 2017-2018 number) based on the current activity for a combine value of $4.7B, which net of associated debt and additional construction costs is worth $2.0B to HHC equity.
Miscellaneous Assets/Other Strategic Developments
Below is a list of the company's other assets, most of these will be redeveloped one day into mixed-use assets, but their potential is too unknown, as a result I'm just marking them at cost/book.
Additionally, Howard Hughes does have a small $109 million NOL tax asset that is shielding some tax liability, once this is used up I'd expect either they would convert to a REIT or spin out the operating properties into a REIT to maintain tax efficiency.Management
Bill Ackman, of Pershing Square, is the Chairman of the Board, he's obviously controversial and Howard Hughes might get lumped into some selling pressure when the market goes after Pershing Square's holdings but Ackman has made it clear that he has the most reputationally at stake with HHC compared to his other holdings (hard to believe based on his actions at VRX and HLF but he has pseudo control here).
Senior management do have warrants that they paid $19 million out of pocket for when joining the company in 2010. The strikes range from $42.23 to $54.50 and are exercisable starting in November 2016 and expire in February 2018. I'd be surprised to see management exercise early.
Adding It All Up
To recap, the above doesn't include:
- New retail at Ward Village - doubling their square footage and significantly upgrading tenants.
- Columbia, MD redevelopment which should start in 2016, 13MM square feet of entitlements (office, retail, multi-family).
- Tin Building renovation and additional development plans at South Street Seaport beyond Pier 17.
- Additional unannounced HHC developed/owned commercial build out of Downtown Summer, Woodlands, Bridgeland.
- Any additional value above book for the miscellaneous Strategic Developments.
- Significant "execution risk", these are complicated developments, I'm sure there are a lot of bureaucratic hoops to jump through (especially in NYC and Honolulu), politicians and unions to please, leases to negotiate - a lot can go wrong from entitlement of a project to it being fully stabilized.
- These are long dated developments, each of their markets is likely to go through a cycle or two before they're fully completed. Markets can also change dramatically from when ground is broken to when construction is finished. Two of HHC's main markets are New York City and Honolulu, prices are high and "always go up" there, need to be careful of anything that "always goes up".
- Houston really struggles and Howard Hughes' assets and land holdings there are permanently impaired.
Disclosure: I own shares of HHC
Excellent! Thanks for sharing.
ReplyDeleteHi - nice post. A couple of comments/questions for your consideration. You're leaving a lot on the table with some of those development entitlements that are excluded from your valuation. Take Summerlin as an example. You mentioned the 185 acres adjacent to Downtown Summerlin but HHC also has additional entitlements for 17k resi units in Summerlin Sth and 24k resi units & 5.85m commercial sqft in Summerlin West... I also notice with the exception of The Woodlands, your valuations for all of the MPCs are at a discount to book value which seems at odds with your investment thesis and HHC's consistent track record of achieving sales/developments at significant premiums to BV? With respect to the South St Seaport development you have assigned $762m in debt plus $402m future development costs. How do you reconcile your debt figure and future costs against the estimated total development cost for this project at $514m? Is the $762m the corporate debt on B/S? You also might want to include the following asset sale in your valuation/Seaport numbers (settled post qtr end so not included in B/S cash..) http://therealdeal.com/2015/08/07/chinese-investment-firm-to-pay-390m-for-seaport-development-site/
ReplyDeleteInterested in your feedback.
thanks
Hi -
DeleteI was intentionally trying to be very conservative on the MPCs and still show that the shares are undervalued, a lot depends on the timing of when those land sales occur and what discount value you put on them. You're right, they're likely worth a lot more than book, especially as each is built out, a network effect essentially takes place and raises the value of the remaining acres around it.
Re: Seaport - Thanks for the article, I remember reading it somewhere but couldn't find it when I was drafting the post, that is a significant development, I'm surprised there wasn't an 8-K disclosing it? Unless I missed it. And I could have show the senior notes in a cleaner fashion, but yes I just allocated them to the Seaport (I'm sure not 100% of it will be used for the Seaport) and brought the cash out front, probably should have just netted the two.
I bet there's a couple other things I missed, I might do a quick update once the 10-K is out and maybe additional plans are disclosed (especially around the Seaport and Columbia).
Thanks for comment.
10-K is out, still no mention of that $390MM Seaport sale? Seems kind of odd.
DeleteAgreed. Company wouldn't comment... press reports suggest the Chinese are planning a super skyscraper on the South St site. Not long after this deal HHC cancelled plans for the proposed hotel-resi tower on the nearby New Market building site. perhaps the two decisions are related.... just a thought. I know HHC think the Seaport development will benefit the surrounding real estate prices and they'd like to acquire additional assets if the right properties come up and they already acquired a nearby hotel
Deletehttps://commercialobserver.com/2015/12/gemini-real-estate-auctions-off-two-manhattan-hotels-for-117m/
http://investor.howardhughes.com/phoenix.zhtml?c=241177&p=irol-newsArticle&ID=2149160
DeleteThere it is, nice bit of good news. Let someone else take on the headache and development risk of building a high rise in NYC.
http://www.wsj.com/articles/vacant-office-spaces-pile-up-in-houston-1453804202
ReplyDeleteMore negative Houston press, I would be surprised if Three Hughes Landing was leased and the rest of the Exxon build-to-suit found a tenant.
Ackman is down almost 20% YTD after being down 20% in 2015. If he ends up a forced seller of his holdings, that would be very bad for HHC. I am not involved either way but wanted to give u heads up.
ReplyDeletehttp://www.finalternatives.com/node/32513
HHC is a fairly small position for him (his smallest?), and with the publicly traded PSH entity, he's over 50% permanent capital. I would imagine a lot would need to go wrong for him to be forced out of HHC. Part of the decline might be what he alluded to in his PSH annual letter, HHC doesn't have many natural holders (index funds, not a REIT/dividend payer) so others following on his coattails might be forced sellers, but I don't see it likely that his fund will sell.
DeletePershing liquidation underway I hear... tighten your seat belt.
ReplyDeleteI see they sold some MDLZ today, was a 30+% position, HHC is much much smaller. Pershing Square is a disaster, but still don't see them being forced to sell HHC given their permanent capital base.
DeleteHi where did you find the data ( chart ) of Summerlin acres and land sales for periods before they were public ( 2007-8-9)?
ReplyDelete